3 Sep
2018

Measuring OEE - Overall Equipment Effectiveness

With these equations, it is easy to get at in-depth look at the various types of loss occurring a plant. Using OEE in conjunction with other techniques such as Total Process Management (TPM) can provide important actionable insights to improving manufacturing, and developing best practices.

Continuous Improvement
Lean Manufacturing
Measuring OEE - Overall Equipment Effectiveness

Overall Equipment Effectiveness (OEE) is a powerful tool used in Lean Manufacturing for determining sources of loss in a factory. However, the calculation of OEE KPIs is really very easy. By using a series of equations, a plant can take collected data and plug it into any metric desired. The difficult parts are collecting quality data, and making good decisions from the analysis.

The best possible OEE score is 100%. This is not physically possible due to laws of thermodynamics, but it serves as the symbol for what a perfectly lossless manufacturing operation would look like.

It is from there that percentages of loss are measured by various metrics, and calculated into a total.

Here’s how it’s done:

The Formulas of OEE    

The simplest way to calculate OEE goes as follows:

OEE = (Good Count x Ideal Cycle Time)/ Planned Production Time

Where

Good Count = Total Count – First Pass Rejects

and

Planned Production Time = Shift Length – Breaks

This method is a perfectly accurate calculation of OEE, but it does not track the individual losses of the Big Six Losses. This is there is the preferred formula for OEE.

The preferred formula is:

OEE = Availability Loss x Performance Loss x Quality Loss

Where each loss type receives a score out of 100% and which together make up the OEE.

The Formulas of Loss Factors

Availability

Availability Loss = Run Time/ Planned Production Time

Where

Run Time  = Planned Production Time – Stop Time

Performance

Production Loss  = (Ideal Cycle Time x Total Count)/ Run Time

This metric can also be calculated as

Production Loss  = (Total Count / Run Time)/ Ideal Run Rate

Where

Run Time = Planned Production Time – Down Time

Quality

Quality Loss = Good Count/ Total Count

With these equations, it is easy to get at in-depth look at the various types of loss occurring a plant. Using OEE in conjunction with other techniques such as Total Process Management (TPM) can provide important actionable insights to improving manufacturing, and developing best practices.

Worximity is deeply committed to the philosophies of Continuous Improvement and Lean Manufacturing in food manufacturing. Using our IoT technology we provide company wide visibility into the statistics that matter to manufacturers and accelerate TTV (Time to Value) of investments in company culture and training to achieve outstanding productivity.

 

Want to learn more?
Download the ebook
Related blog articles

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
1
Nov 2023

How Displaying KPIs on the Factory Floor Can Engage your Team

English
23
May 2019

4 Quick Actions to Engage Your Teams in Industry 4.0

English
12
Sep 2018

What Will Your Digital Action Plan Be?

English

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
4
Mar 2019

À la recherche d'une solution à la pénurie de main-d'oeuvre?

Êtes-vous à la recherche d'une solution à la main-d'oeuvre? Voyez ce que plusieurs entreprises manufacturières font!

French
30
Mar 2020

Industrie 4.0 - moteur de changement dans l'industrie manufacturière et les opérations

L'industrie 4.0 offre des technologies aux manufactures voulant améliorer de façon inégalée leur productivité, efficacité et qualité de fabrication.

French
2
Jul 2019

Réussir dans l'Industrie 4.0 avec le leadership agile

La clé du succès pour les entreprises qui passent à l’industrie 4.0 sera de favoriser un leadership agile dès le début de la transition. Apprenez-en plus sur cette approche.

French