3 Sep
2018

Measuring OEE - Overall Equipment Effectiveness

With these equations, it is easy to get at in-depth look at the various types of loss occurring a plant. Using OEE in conjunction with other techniques such as Total Process Management (TPM) can provide important actionable insights to improving manufacturing, and developing best practices.

Continuous Improvement
Lean Manufacturing
Measuring OEE - Overall Equipment Effectiveness

Overall Equipment Effectiveness (OEE) is a powerful tool used in Lean Manufacturing for determining sources of loss in a factory. However, the calculation of OEE KPIs is really very easy. By using a series of equations, a plant can take collected data and plug it into any metric desired. The difficult parts are collecting quality data, and making good decisions from the analysis.

The best possible OEE score is 100%. This is not physically possible due to laws of thermodynamics, but it serves as the symbol for what a perfectly lossless manufacturing operation would look like.

It is from there that percentages of loss are measured by various metrics, and calculated into a total.

Here’s how it’s done:

The Formulas of OEE    

The simplest way to calculate OEE goes as follows:

OEE = (Good Count x Ideal Cycle Time)/ Planned Production Time

Where

Good Count = Total Count – First Pass Rejects

and

Planned Production Time = Shift Length – Breaks

This method is a perfectly accurate calculation of OEE, but it does not track the individual losses of the Big Six Losses. This is there is the preferred formula for OEE.

The preferred formula is:

OEE = Availability Loss x Performance Loss x Quality Loss

Where each loss type receives a score out of 100% and which together make up the OEE.

The Formulas of Loss Factors

Availability

Availability Loss = Run Time/ Planned Production Time

Where

Run Time  = Planned Production Time – Stop Time

Performance

Production Loss  = (Ideal Cycle Time x Total Count)/ Run Time

This metric can also be calculated as

Production Loss  = (Total Count / Run Time)/ Ideal Run Rate

Where

Run Time = Planned Production Time – Down Time

Quality

Quality Loss = Good Count/ Total Count

With these equations, it is easy to get at in-depth look at the various types of loss occurring a plant. Using OEE in conjunction with other techniques such as Total Process Management (TPM) can provide important actionable insights to improving manufacturing, and developing best practices.

Worximity is deeply committed to the philosophies of Continuous Improvement and Lean Manufacturing in food manufacturing. Using our IoT technology we provide company wide visibility into the statistics that matter to manufacturers and accelerate TTV (Time to Value) of investments in company culture and training to achieve outstanding productivity.

 

Want to learn more?
Download the ebook
Related blog articles

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
27
Mar 2020

Ce que vous devez savoir sur le monitoring de la production en 2020

French
17
Sep 2019

Types de gaspillages dans le lean manufacturing - le gaspillage dû à l'attente

French
19
Nov 2019

Types de gaspillages dans le lean manufacturing - le gaspillage résultant des mouvements et des gestes inutiles

French

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
27
Aug 2018

La CCMM publie un cahier spécial sur la main d'oeuvre 4.0 dans LaPresse+

La CCMM publie un cahier spécial Industrie 4.0 dans LaPresse+ du 20 aout 2018. Le cahier propose des pistes de solutions pour faire face aux enjeux de recrutementent de formation de la main d'oeuvre 4.0

French
23
Mar 2020

Now More Than Ever, the Connected Workforce is Vital

Now more than ever, the connected workforce is vital. How do you move your manufacturing business forward?

English
18
Oct 2019

The Connected Worker - Resources for  Manufacturing Decision Makers

Thinking of moving your food manufacturing business to Industry 4.0? Get important resources about the Connected Worker here!

English