5 Sep
2018

Know Your OEE Terms

Overall Equipment Effectiveness (OEE) is a vital part of any manufacturing company’s continuous improvement initiative. The system provides a powerful framework for determining the causes of waste in a factory, and showing how they interact and compound.

Continuous Improvement
Lean Manufacturing
Know Your OEE Terms

Overall Equipment Effectiveness (OEE) is a vital part of any manufacturing company’s continuous improvement initiative. The system provides a powerful framework for determining the causes of waste in a factory, and showing how they interact and compound. But like any system, to make it work the user must understand the pieces. This article is a breakdown of all the necessary terms one must understand to implement OEE in their workplace.

Overall Equipment Effectiveness (OEE)

This term refers to percent of Fully Productive Work accomplished during Planned Production Time, and takes into account all losses. Fully Productive Work refers to work that directly contributes to creating value, excluding maintenance and changeout. Planned Production Time is the term used to describe the total time minus the Schedule Loss, or all time the factory is meant to be actively manufacturing.

Loss Factors

The Loss Factors are the individual pieces that subtract from a perfect OEE score of 100%. These Loss Factors are Availability Loss, Performance Loss, and Quality Loss

Availability Loss is the loss derived from Planned and Unplanned Stops during Planned Production Time. A Planned Stop is a period of changeover, setup, or a make-ready event during which no value is produced. An Unplanned Stop is a stop due to equipment failure, which halts production.

Performance Loss considers Slow Cycles and Small Stops during production. A Slow Cycle is any cycle that takes longer than the Ideal Cycle Time, which is the theoretical maximum speed at which a discrete item may be produced. A Small Stop, also called a Minor Stop or Idling is counted as any pause in production that is not significant enough to be tracked as Stop Time.

Quality Loss refers to the loss incurred by faulty parts, including Rework Parts. This is measured as a combination of Startup Loss and Process Loss. Startup Loss or Reduced Yield includes all defective parts produced from startup until equipment reaches stable (steady-state) production. Process Loss includes any defective part made once the production is stable. A Rework Part is a part that although initially rejected, can be fixed and sold to the customer. However, due to the fact that its initial production was not purely value-adding time, that time is counted as a loss.

Altogether, Planned and Unplanned Stops, Slow Cycles and Small Stops, and Startup Loss and Process Loss are known as the Big Six Losses.

Know Your OEE Terms

Know Your OEE Terms Courtesy https://www.leanproduction.com/oee.html

Loss and Time

Given the many different variables that go into OEE, it isn’t surprising that there are also many ways to describe the interplay of the various losses. And because of the time-based nature of OEE, these terms describe loss in relation to the Big Six Losses and All Time.

All Time covers the entire duration of the work day, equipment functioning and no. Planned Production Time is defined as All Time minus Scheduled Loss, which was already defined above.

Run Time is the Planned Production Time minus the Availability Loss. This is the duration of time during which equipment is actively producing value, ignoring Small Stops and Idling.

Net Run Time is the Run Time minus Performance Loss. This is the most detailed measure of the time loss due to equipment not functional at optimum capacity.

Finally, Fully Productive Time is defined as the Net Run Time minus the Quality Loss. This metric takes Net Run Time, and discounts any time during production where loss was incurred by creating a defective part. The ratio of Fully Productive Time to Planned Production Time is how the OEE is calculated. The resulting number is a percentage out of 100, which takes into account every loss as it compounds.

Being able to effectively use the language of OEE will ensure a smooth implementation of the system. By having a common understanding of the underlying theory behind each term, management and workers alike can avoid confusion and successfully carry out important continuous improvement in their factory.

Worximity is deeply committed to the philosophies of Continuous Improvement and Lean Manufacturing in food manufacturing. Using our IoT technology we provide company wide visibility into the statistics that matter to manufacturers and accelerate TTV (Time to Value) of investments in company culture and training to achieve outstanding productivity.

 

Want to learn more?
Download the ebook
Related blog articles

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
24
Nov 2019

Les méthodes Poka-Yoke dans un contexte de lean manufacturing

French
12
Nov 2019

3 outils d'amélioration continue puissants

French
18
May 2018

Tirer le meilleur des stratégies de production Lean et Six Sigma grâce à l’industrie 4.0

French

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
30
May 2018

How to Get Started as a Developer in AI

For developers, the expansion of the AI field means that you have the potential to apply your interest and knowledge of AI toward an industry like the manufacturing industry.

English
6
Dec 2018

AI in Baking for Real-Time Predictions

Get to know more about Dutch powerhouse Bakkersland and their experience with the implementation of AI in their factories.

English
15
Feb 2018

Harvard Business Review Article on Artificial Intelligence

AI won’t replace managers, but managers who use AI will replace those who don’t. Learn what artificial intelligence can do for your business.

English