28 May
2018

How to use OEE in smart manufacturing

The OEE calculation rolls the “6 big losses” of TPM into one number that represents the effective operating rate for a piece of equipment or synchronized line—in other words, the percent of time the equipment or line is operating effectively, or its valuable operating time.

Lean Manufacturing
How to use OEE in smart manufacturing

An article on the Industry Week's website OEE - Learn How to Use It Right clearly explains what is Overall Equipment Effectiveness and how to use it.

"Put simply, OEE assigns numerical value to improvement opportunity. It factors in the availability, performance and quality of output of a given piece of equipment and tells you this:

How much right-first-time product did this machine produce
compared to what it should have produced
in the allocated time?

In other words, is a piece of equipment effective within its value stream? Does it let you meet present or future customer demand? If not (and this is critical), OEE helps you analyze the reasons why so you can address them systematically."

How is OEE calculated

OEE (%) = Availability rate × Performance rate × Quality rate

Availability rate (percentage of time the machine is ready to produce, working properly, and not in the midst of changeovers or adjustments) = Available time (scheduled operating time − downtime) ÷ Scheduled operating time.

Performance rate (ratio of output produced compared to a standard) = Actual output ÷ Standard output.

Quality rate (ratio of good output compared to actual output)= Right-first-time output ÷ Actual output.

How to Use OEE 

The author of the article in Industry Week  highlights 4 key uses:

  1. Use OEE as an improvement metric.
  2. OEE is best used on a single piece of equipment or synchronized line.
  3. There is no absolute that works as an OEE benchmark or target – it’s relative to your situation.
  4. As a Yardstick for measuring improvement

Start Monitoring your OEE today

Worximity now offers new Overall Equipment Effectiveness add-on for Smart Factory Level 3.

Worximity_PC_OEE_alert

SOURCE: http://www.industryweek.com/quality/oee-learn-how-use-it-right

Want to learn more?
Download the ebook
Related blog articles

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
9
Mar 2021

Le lean manufacturing c'est beaucoup plus que simplement mesurer le TRG

French
16
Feb 2021

Quels paramètres du lean manufacturing utilisés pour calculer le TRG devez-vous toujours mesurer?

French
11
Mar 2020

14 points de Deming dans l'industrie manufacturière

French

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
5
Sep 2023

Your Guide to Digital Transformation with Worximity

With Worximity, you don’t just get a technology provider, you get a partner who supports you throughout your manufacturing digital transformation.

English
7
Sep 2023

Mitigating Debt Servicing Challenges with Production Monitoring

Interest rates are up, and demand is down. Strapped with higher loan repayments many of today’s manufacturers are caught in the middle. Read how optimizing manufacturing operations is mitigating the challenges of debt servicing.

English
24
Aug 2023

Simplifying Adoption of Smart Technology for Manufacturers of All Types and Sizes

It's time we stopped talking about the challenges plaguing manufacturers and started focusing more on the solutions and opportunities that can help mitigate them.

English