28 May
2018

How to use OEE in smart manufacturing

The OEE calculation rolls the “6 big losses” of TPM into one number that represents the effective operating rate for a piece of equipment or synchronized line—in other words, the percent of time the equipment or line is operating effectively, or its valuable operating time.

Lean Manufacturing
How to use OEE in smart manufacturing

An article on the Industry Week's website OEE - Learn How to Use It Right clearly explains what is Overall Equipment Effectiveness and how to use it.

"Put simply, OEE assigns numerical value to improvement opportunity. It factors in the availability, performance and quality of output of a given piece of equipment and tells you this:

How much right-first-time product did this machine produce
compared to what it should have produced
in the allocated time?

In other words, is a piece of equipment effective within its value stream? Does it let you meet present or future customer demand? If not (and this is critical), OEE helps you analyze the reasons why so you can address them systematically."

How is OEE calculated

OEE (%) = Availability rate × Performance rate × Quality rate

Availability rate (percentage of time the machine is ready to produce, working properly, and not in the midst of changeovers or adjustments) = Available time (scheduled operating time − downtime) ÷ Scheduled operating time.

Performance rate (ratio of output produced compared to a standard) = Actual output ÷ Standard output.

Quality rate (ratio of good output compared to actual output)= Right-first-time output ÷ Actual output.

How to Use OEE 

The author of the article in Industry Week  highlights 4 key uses:

  1. Use OEE as an improvement metric.
  2. OEE is best used on a single piece of equipment or synchronized line.
  3. There is no absolute that works as an OEE benchmark or target – it’s relative to your situation.
  4. As a Yardstick for measuring improvement

Start Monitoring your OEE today

Worximity now offers new Overall Equipment Effectiveness add-on for Smart Factory Level 3.

Worximity_PC_OEE_alert

SOURCE: http://www.industryweek.com/quality/oee-learn-how-use-it-right

Want to learn more?
Download the ebook
Related blog articles

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
11
Dec 2019

Évaluez votre logiciel de lean manufacturing

French
18
Nov 2019

Transformation de la viande en utilisant les méthodes d'usine intelligente - Introduction #1

French
13
Apr 2018

Tips for Implementing 5S Lean Manufacturing in the Dairy Industry

English

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
27
Jul 2023

Production Monitoring or ERP: what your manufacturing plant really needs.

Remaining competitive and maximizing efficiency is crucial in today’s manufacturing landscape. To achieve these goals, manufacturers are often faced with the dilemma of selecting the right software solutions to streamline operations.

English
25
Jul 2023

Décomposer le TRG pour assurer le succès de votre usine

Découvrez comment la décomposition du taux de rendement global (TRG) en mesures pertinentes pour l'usine est le moteur du succès opérationnel.

French
25
Jul 2023

Breaking Down OEE for Shop Floor Success

Discover how breaking down Overall Equipment Effectiveness (OEE) into relevant metrics for the shop floor drives operational success.

English