An Example of How to Calculate OEE in Manufacturing

Calculating your overall equipment effectiveness is important in running your production plant efficiently. In this article, we give you a clear example of how to do it.

OEE
OEE in Manufacturing Industry
An Example of How to Calculate OEE in Manufacturing

Measuring overall equipment effectiveness (OEE) is crucial to maximizing factory efficiency, so we tend to discuss it frequently. OEE reveals the financial impact of improvements, in addition to evaluating production performance.

How to Calculate OEE

OEE = Availability x Performance x Quality

Looking at a formula is one thing—applying it is another. The best way to truly understand how to calculate OEE is with a good example. The following OEE calculation example will help you understand how to apply it to your situation.

What Factors to Consider

We know that determining OEE requires three factors—here’s what they mean:

• Availability: Run time or planned production time

• Performance: Actual cycle time or ideal cycle time  

• Quality: Good products or total products produced

If you’re wondering how this formula works in a real factory, the following is a good example.

Calculating the OEE of an Electronic Company’s Production Plant

Let’s use an electronic company’s production plant with the following schedule:

• The company is open for 14 hours every day.

• The manufacturing plant operates for 10 hours a day 20 days a month.

Availability: Calculating Planned Production Time

Our planned production time is 200 hours a month because this is how much we plan to keep the equipment running.

However, each workday, operators take a half-hour lunch break, two hours of maintenance is planned each month, and equipment breaks down for an average of three hours per month.

This gives us a total of 15 hours of downtime per month:

• 10 hours of lunch breaks,

• two hours of maintenance and

• three hours of equipment failure.

15 hours / 200 hours = 7.5% → 100% - 7.5% = 92.5% availability = 185 hours of actual run time

Performance: Calculating Cycle Time

Our equipment could ideally complete 60 cycles per minute. However, it performed only 52 cycles each minute in the past month.

52 cpm / 60 cpm = 86.6% performance

Quality: Accounting for Rejects

It takes 50 cycles to produce any electronic; therefore, our production plant is producing roughly 62 electronics each hour.

52 cpm × 60 minutes = 3120 cycles per hour

3120 cycles / 50 cycles per electronic = 62 electronics/hour

Multiplying that by 185 run time hours per month, we get a total production of 11,470 electronics per month. However, only 10,950 of these electronics are good.

This means we have a quality score of 95.5%

10,950 / 11,470

In summary, the equipment is:

• available 92.5 percent of the time,

• its performance is 86.6 percent effective,

• and product quality is at 95.5 percent

Let’s Calculate OEE

Using the above numbers, the plant's overall equipment effectiveness equates to 76.5%:

OEE= 92.5% x 86.6% x 95.5% = 76.5%

While individual metrics for each input appear to be relatively high, it is evident that their collective impact can significantly downgrade the overall efficiency of the plant when calculating OEE.

The question we then need to ask ourselves is how good or bad is an OEE score of 76.5 percent? For many manufacturers, it could be sufficient, or at least a good benchmark. General OEE industry standards are as follows:

• 100%: Perfect

• 85%: World-class level, and often a goal for discrete manufacturers

• 60%: Typical, but with clear room for improvement

• 40%: Low, but typical for factories that are measuring OEE for the first time

Using Smart Factory Technology and OEE Software to Improve Productivity

Smart factory technology is crucial for those who want to calculate an accurate OEE and know if each process is maximally productive. Using smart factory features such as automated data collection, real-time dashboards, and analytics reporting, managers can determine things like:

• If small stops are becoming a significant issue.

• What is causing slow cycles and speed loss.

• How well workers are following processes.

• What planned and unplanned downtime look like.

Find Out How to Calculate OEE for Your Plant

Take control of your plant's effectiveness with Worximity’s Smart Factory technology. Empower you and your team to improve performance by uncovering hidden capacity and boosting production.

Not sure where to start? Try our OEE calculator.

Want to learn more?
Download the ebook
Related blog articles

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
13
Jul 2023

5 Ways Production Monitoring Helps Reduce Turnover and Bridge the Skills Gap

English
15
Sep 2020

Why It’s Time to Prioritize Your Manufacturing Data Collection

English
19
Apr 2021

Learn How to Improve Raw Materials Yield by Connecting Your Scales and Checkweighers

English

Related articles

Back to the blog
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
27
Jun 2023

Au-delà des chiffres : maximiser le retour sur investissement dans le secteur manufacturier grâce à l'analyse de données

L'intelligence des données provient de chiffres bruts. Ces informations doivent être analysées et traduites en actions ayant un impact sur l'entreprise. Mais avec des données qui s'accumulent plus vite qu'elles ne peuvent être transformées en analyses de données manufacturières, les entreprises ratent des opportunités.

French
27
Jun 2023

Going Beyond the Numbers: Maximizing ROI with Data Analytics in Manufacturing

Technology has given rise to data – reams of it. In fact, in today’s digital environment there is more data available to manufacturers than in all of history combined. Yet for many manufacturers big data is a big problem.

English
19
Jun 2023

Créer une culture du changement : Stratégies pour faire adhérer au changement

Les entreprises qui réussissent sont toujours en quête d'amélioration. Cela peut se traduire par la mise en place de programmes visant à réduire le temps ou les coûts de production, ou à améliorer des domaines tels que la durabilité, la sécurité, la productivité, la rentabilité ou la part de marché.

French