3 Sep
2018

Measuring OEE - Overall Equipment Effectiveness

With these equations, it is easy to get at in-depth look at the various types of loss occurring a plant. Using OEE in conjunction with other techniques such as Total Process Management (TPM) can provide important actionable insights to improving manufacturing, and developing best practices.

Continuous Improvement
Lean Manufacturing
Mesure de l'efficacité globale des équipements (OEE)

Overall Equipment Effectiveness (OEE) is a powerful tool used in Lean Manufacturing for determining sources of loss in a factory. However, the calculation of OEE KPIs is really very easy. By using a series of equations, a plant can take collected data and plug it into any metric desired. The difficult parts are collecting quality data, and making good decisions from the analysis.

The best possible OEE score is 100%. This is not physically possible due to laws of thermodynamics, but it serves as the symbol for what a perfectly lossless manufacturing operation would look like.

It is from there that percentages of loss are measured by various metrics, and calculated into a total.

Here’s how it’s done:

The Formulas of OEE    

The simplest way to calculate OEE goes as follows:

OEE = (Good Count x Ideal Cycle Time)/ Planned Production Time

Where

Good Count = Total Count – First Pass Rejects

and

Planned Production Time = Shift Length – Breaks

This method is a perfectly accurate calculation of OEE, but it does not track the individual losses of the Big Six Losses. This is there is the preferred formula for OEE.

The preferred formula is:

OEE = Availability Loss x Performance Loss x Quality Loss

Where each loss type receives a score out of 100% and which together make up the OEE.

The Formulas of Loss Factors

Availability

Availability Loss = Run Time/ Planned Production Time

Where

Run Time  = Planned Production Time – Stop Time

Performance

Production Loss  = (Ideal Cycle Time x Total Count)/ Run Time

This metric can also be calculated as

Production Loss  = (Total Count / Run Time)/ Ideal Run Rate

Where

Run Time = Planned Production Time – Down Time

Quality

Quality Loss = Good Count/ Total Count

With these equations, it is easy to get at in-depth look at the various types of loss occurring a plant. Using OEE in conjunction with other techniques such as Total Process Management (TPM) can provide important actionable insights to improving manufacturing, and developing best practices.

Worximity is deeply committed to the philosophies of Continuous Improvement and Lean Manufacturing in food manufacturing. Using our IoT technology we provide company wide visibility into the statistics that matter to manufacturers and accelerate TTV (Time to Value) of investments in company culture and training to achieve outstanding productivity.

 

Want to learn more?
Download the ebook
Related blog articles

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
9
Juin 2021

How to Transform Your Continuous Improvement Plan from Paper to Digital

English
6
septembre 2018

What is OEE? - Overall Equipment Effectiveness

English
17
Fév 2022

3 Reasons to Involve Factory Operators in Your Next Continuous Improvement Project

English

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
4
Mars 2022

Manufacturing Leadership: How to Create Ownership Across Your Work Teams

Find out how fostering ownership across teams is essential to being an effective manufacturing leader.

English
10
mai 2019

Pénurie de main d'oeuvre dans le secteur manufacturier québécois

Un article paru dans lapresse+ présente le paradoxe d'un marché manufacturier québécois qui connait une belle expansion mais dont l'essor pourrait être freiné par le manque de main d'oeuvre qui dépasse les 20% dans certaines PME québécoises.

French
28
Fév 2020

SaaS Training and User Adoption Best Practices

Implementing a SaaS solution takes having a strong user adoption plan.

English