28 May
2018

How to use OEE in smart manufacturing

The OEE calculation rolls the “6 big losses” of TPM into one number that represents the effective operating rate for a piece of equipment or synchronized line—in other words, the percent of time the equipment or line is operating effectively, or its valuable operating time.

Lean Manufacturing
Comment utiliser l'OEE dans la fabrication intelligente

An article on the Industry Week's website OEE - Learn How to Use It Right clearly explains what is Overall Equipment Effectiveness and how to use it.

"Put simply, OEE assigns numerical value to improvement opportunity. It factors in the availability, performance and quality of output of a given piece of equipment and tells you this:

How much right-first-time product did this machine produce
compared to what it should have produced
in the allocated time?

In other words, is a piece of equipment effective within its value stream? Does it let you meet present or future customer demand? If not (and this is critical), OEE helps you analyze the reasons why so you can address them systematically."

How is OEE calculated

OEE (%) = Availability rate × Performance rate × Quality rate

Availability rate (percentage of time the machine is ready to produce, working properly, and not in the midst of changeovers or adjustments) = Available time (scheduled operating time − downtime) ÷ Scheduled operating time.

Performance rate (ratio of output produced compared to a standard) = Actual output ÷ Standard output.

Quality rate (ratio of good output compared to actual output)= Right-first-time output ÷ Actual output.

How to Use OEE 

The author of the article in Industry Week  highlights 4 key uses:

  1. Use OEE as an improvement metric.
  2. OEE is best used on a single piece of equipment or synchronized line.
  3. There is no absolute that works as an OEE benchmark or target – it’s relative to your situation.
  4. As a Yardstick for measuring improvement

Start Monitoring your OEE today

Worximity now offers new Overall Equipment Effectiveness add-on for Smart Factory Level 3.

Worximity_PC_OEE_alert

SOURCE: http://www.industryweek.com/quality/oee-learn-how-use-it-right

Want to learn more?
Download the ebook
Related blog articles

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
17
Juillet 2018

Where do food manufacturers begin the journey toward smart manufacturing?

English
20
Août 2018

TED Talk: Why Productivity and Flexibility in IIoT Matter

English
13
Déc 2019

Comment les gestionnaires d'opérations embrassent l'Industrie 4.0

French

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
20
Fév 2024

Comment les entreprises ont mis en oeuvre les 14 points de Deming dans le secteur manufacturier

Les 14 points de gestion de Deming ainsi que la suite d'outils de performance de Worximity stimulent l'amélioration et l'innovation dans le secteur manufacturier.

French
16
Fév 2024

Principales différences entre la fabrication discrète et la production par processus

Découvrez le rôle essentiel que joue votre logiciel dans la fabrication discrète et dans la production par processus.

French
23
Janvier 2024

Optimisation des opérations à l'échelle de l'entreprise : analyse de données dans l'industrie manufacturière avec l’aide de Worximity

Découvrez comment Worximity transforme les opérations manufacturières en exploitant l'analyse des données en temps réel, apportant efficacité et innovation à l'Industrie 4.0 tout en responsabilisant les départements au-delà de la gestion de la production.

French