28 May
2018

How to use OEE in smart manufacturing

The OEE calculation rolls the “6 big losses” of TPM into one number that represents the effective operating rate for a piece of equipment or synchronized line—in other words, the percent of time the equipment or line is operating effectively, or its valuable operating time.

Lean Manufacturing
Comment utiliser l'OEE dans la fabrication intelligente

An article on the Industry Week's website OEE - Learn How to Use It Right clearly explains what is Overall Equipment Effectiveness and how to use it.

"Put simply, OEE assigns numerical value to improvement opportunity. It factors in the availability, performance and quality of output of a given piece of equipment and tells you this:

How much right-first-time product did this machine produce
compared to what it should have produced
in the allocated time?

In other words, is a piece of equipment effective within its value stream? Does it let you meet present or future customer demand? If not (and this is critical), OEE helps you analyze the reasons why so you can address them systematically."

How is OEE calculated

OEE (%) = Availability rate × Performance rate × Quality rate

Availability rate (percentage of time the machine is ready to produce, working properly, and not in the midst of changeovers or adjustments) = Available time (scheduled operating time − downtime) ÷ Scheduled operating time.

Performance rate (ratio of output produced compared to a standard) = Actual output ÷ Standard output.

Quality rate (ratio of good output compared to actual output)= Right-first-time output ÷ Actual output.

How to Use OEE 

The author of the article in Industry Week  highlights 4 key uses:

  1. Use OEE as an improvement metric.
  2. OEE is best used on a single piece of equipment or synchronized line.
  3. There is no absolute that works as an OEE benchmark or target – it’s relative to your situation.
  4. As a Yardstick for measuring improvement

Start Monitoring your OEE today

Worximity now offers new Overall Equipment Effectiveness add-on for Smart Factory Level 3.

Worximity_PC_OEE_alert

SOURCE: http://www.industryweek.com/quality/oee-learn-how-use-it-right

Want to learn more?
Download the ebook
Related blog articles

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
17
Oct 2019

La gestion manufacturière: le maestro de l'usine de production alimentaire

French
22
Oct 2019

Comprendre les facteurs et les données du TRG

French
21
Août 2018

Five Pillars of a Successful AI-based Transformation

English

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
1
Août 2023

Comment Worximity transforme les données de votre usine en indicateurs de performance qui stimulent la productivité

Les entreprises manufacturières sont assises sur une mine d'or d'informations et Worximity met ces informations essentielles à la portée des entreprises manufacturières de tous types et de toutes tailles.

French
1
Août 2023

How Worximity Transforms Data from Your Shop Floor into Metrics that Drive Productivity

Manufacturers are sitting on a gold mine of data and Worximity puts this critical information within reach for manufacturers of all types and sizes.

English
27
Juillet 2023

Monitoring de la production ou ERP: ce dont votre usine a vraiment besoin.

Rester compétitif et maximiser l'efficacité est crucial dans le paysage manufacturier d'aujourd'hui. Pour atteindre ces objectifs, les entreprises manufacturières sont souvent confrontées au dilemme de sélectionner les bonnes solutions logicielles pour rationaliser les opérations.

French