28 May
2018

How to use OEE in smart manufacturing

The OEE calculation rolls the “6 big losses” of TPM into one number that represents the effective operating rate for a piece of equipment or synchronized line—in other words, the percent of time the equipment or line is operating effectively, or its valuable operating time.

Lean Manufacturing
Comment utiliser l'OEE dans la fabrication intelligente

An article on the Industry Week's website OEE - Learn How to Use It Right clearly explains what is Overall Equipment Effectiveness and how to use it.

"Put simply, OEE assigns numerical value to improvement opportunity. It factors in the availability, performance and quality of output of a given piece of equipment and tells you this:

How much right-first-time product did this machine produce
compared to what it should have produced
in the allocated time?

In other words, is a piece of equipment effective within its value stream? Does it let you meet present or future customer demand? If not (and this is critical), OEE helps you analyze the reasons why so you can address them systematically."

How is OEE calculated

OEE (%) = Availability rate × Performance rate × Quality rate

Availability rate (percentage of time the machine is ready to produce, working properly, and not in the midst of changeovers or adjustments) = Available time (scheduled operating time − downtime) ÷ Scheduled operating time.

Performance rate (ratio of output produced compared to a standard) = Actual output ÷ Standard output.

Quality rate (ratio of good output compared to actual output)= Right-first-time output ÷ Actual output.

How to Use OEE 

The author of the article in Industry Week  highlights 4 key uses:

  1. Use OEE as an improvement metric.
  2. OEE is best used on a single piece of equipment or synchronized line.
  3. There is no absolute that works as an OEE benchmark or target – it’s relative to your situation.
  4. As a Yardstick for measuring improvement

Start Monitoring your OEE today

Worximity now offers new Overall Equipment Effectiveness add-on for Smart Factory Level 3.

Worximity_PC_OEE_alert

SOURCE: http://www.industryweek.com/quality/oee-learn-how-use-it-right

Want to learn more?
Download the ebook
Related blog articles

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
21
Mai 2018

Comment éviter des coûteuses erreurs face à l’IIoT

French
22
Mai 2018

Des améliorations continues en 3 étapes grâce à une usine intelligente

French
22
Mars 2018

Top Lean Manufacturing Technology Trends that will Change your Life

English

Articles connexes

Retour au blog
Nous vous remercions ! Votre demande a bien été reçue !
Oups ! Un problème s'est produit lors de l'envoi du formulaire.
11
Avril 2024

Votre guide en matière de contrôle statistique du processus (CSP)

En tant qu’entreprise manufacturière, il est essentiel de comprendre le contrôle statistique du processus pour survivre et prospérer dans l’environnement hyper-compétitif d’aujourd’hui.

French
10
Avril 2024

Définir la différence entre le temps de production et le temps de cycle

Le temps de cycle et le temps de production sont des indicateurs clés de la performance manufacturière. Découvrez ce que chacun signifie et comment les utiliser pour augmenter la productivité dans le cadre de votre processus de production.

French
13
mars 2024

Moteurs d’efficacité manufacturière : Monitoring des machines et du TRG

Le monitoring des machines et du TRG (taux de rendement global) sont efficaces pour améliorer l'efficacité globale, mais quelle est la différence entre eux et qu'est-ce qui est le mieux adapté à vos opérations?

French